Energy meter servicing, testing and certification up to 100 A at site |
TOP |
Testing as per IS standards 13010 or 13779 |
100 % unity, |
100% 0.86 lag |
50 % unity, |
50% 0.86 lag |
10 % unity, |
10% 0.86 lag |
Dial test |
Creep Test |
Meter programming |
M.F. confirmation |
Refixing of energy meter |
verification of C.T. polarity, |
M.F. confirmation |
Testing through meter testing kit traceability of government lab. |
|
|
|
......................................................................................................................................................................................................................................... |
|
Preventive Maintenance, Retrofitting & AMC of ACB, Switch Fuse Unit, MCCB, RCCB, MOTOR STARTER |
TOP |
- Cleaning of breaker with CRC-226
- Removal of old grease and re-greasing the same with recommended grease.
- Check condition of arcing contact and gap between fixed and moving arcing contacts shall be checked.
- Checking the reset mechanism, tripping of breaker through push button
- Checking tripping of ACB through protection release
- Tripping of ACB manually through volt metric release.
- Checking and adjust freeness of DN and volt metric release trip rod
- Checking presence and proper tightening of hardware.
- Checking presence of all circlips
- Checking condition and alignment of jaw contact with cradle terminals
- Checking condition of ACB wiring and replace if required
- Checking and adjusting gap between hylam sheet and side plate
- Checking proper closing of all poles together
- Checking working of anti pumping device in case of EDO ACB
- Checking alignment of SIC and it’s operation
- Checking scrapping earth alignment
- Checking condition of arc chutes
- Checking U/V release pick up and drop off
- Checking ACB tripping through shunt release
- Checking motor operation in case of EDO ACB
- Checking closing coil operation in case of EDO ACB
- Checking continuity and proper changeover of aux contact block
- Checking of release by secondary injection for O/L, S/C, E/F
- Setting of release as per the load
- Checking the healthiness of CTs
- The spare parts, accessories would have to be provided by the customer.
|
|
......................................................................................................................................................................................................................................... |
|
Procedure for testing the meters on line |
TOP |
Now in market the energy meters are available with indicating with all parameters, also we can connect sizable meter in PC so we can take the data on PC of all factory. |
|
Meter are install for feeder consumption to record KWh units but now due to all parameters we can record all parameters of meter due to this we can find out what are the erratic parameter on feeder and we can rectify those parameters by modification. |
|
Electric consumption are depend upon your healthy network system if your system are not healthy you can suffer extra electric consumption which are increase KWH |
|
......................................................................................................................................................................................................................................... |
|
Why Energy Meter Testing Is Required? |
TOP |
• The energy meter is heart of the power supply network
• If the energy meter is correct the consumption recorded and the billing is correct. If the energy meter is not correct we lose on all fronts.
• Therefore the energy meters are required to be checked tested and calibrated on regular intervals.
|