Post Buy Offer
Post Sell Offer
Company Name
YASHITA ELECTRICALS PVT.LTD.
Contact Person
MR.KIRAN GHONGADE
Tel No.
- 8237055991 / 8087121999
Address
Office No.503, Narayan Chambers, Sr.176, Behind HP Petrol Pump, Bhekrainagar Fursungi, Hadapsar, Pune - 412308
Activities
Design & Engineering Services, Erection & Commissioning, Skilled Man Power Supply, Calibration Services, Material Supply - All Types Of Electrical Material, Cables, Cable Trays & Accessories, (On-Site & Off-Site Calibration Services For All Types Of Instruments), - Pressure Gauge, Vacuum Gauge, Vacuum Transmitter, Pressure Switch, Vacuum Switch, Magnehelic Gauge, Multimeter, Clampmeter/ Tong Meter, Ammeter, Voltmeter, Power Meter, Resistance Meter, Capacitance Meter, LCR Meter, Frequency Meter, Electrical Tester, Kv Meter (Panel Meter), Insulation Tester / Megger, Earth Tester, Pressure Transmitter, Level Transmitter, Flow Transmitter, Flow Switch / Level Switch, Temp. Indicator, Temp. Controller, HV Tester, BDV Tester, Digital Tachometer, Sound Level Meter, Lux Meter, TDS Meter, PH Meter, Conductivity Meter, Temperature Switch, Engineering Services For Instrumentation & Electrical Design, Installation & Commissioning Services, Authorized Dealership - Orient Electric (Lighting Division), Preparation Of Instrumentation Index. Data Sheet For Instruments, Valves, Control System (PLC Based), MCC Panel, Motors, VFD’s, Soft Starter, Preparation Of Cable Tray Routing Drawing, Hook-Up & SLD For MCC Panel In Autocad, Cable List / Schedule Preparation As Per Panel Wiring Diagram, Selection Of LV Power Cable Based On Fault Level Current Considering The Accepted, Limit Of Voltage Drop To Minimize The Line Losses As Low As Possible, Selection Of HT Cables Based On Short Current And Considering De-Rating Factors, Bill Of Material (BOM) Preparation For Installation Of Instrumentation & Electrical, Systems Like HT Yard, PCC, MCC, LDB, APFC Panel, Optimum Size Selection & Calculation Of Transformer, HT Breaker, LT Breaker Starter, Fault Level Calculation At The LV Side Of Transformer Based On Site Requirement, Maximum Demand Optimum Calculation Of The Plants To Avoid Extra Billing Charges, Earthing Strip Size Calculation Based On Different Fault Level Current. Transformer’s, Neutral Earthing Calculation, Sub- Station Design And Equipment Layout Planning, Lightning Arrester Selection And Quantity Calculation, Panels Bus-Bar Size Calculation, Street Light Pole & Voltage Drop Calculation. Calculation Of No. Of Light Fixture & Lux, Capacitor Size Calculation For Power Factor Improvement, DG Size Calculation, Air Conditioner Size Calculation, Air Compressor Size Calculation And Line Size Selection, Quality Assurance Test Shall Be Carried Out At Vendors Place On Need Basis, Site Support In Terms Of Engineering Requirement, Site Survey For Modernization/Revamping Kind Of Plants – On Need Basis, Plant Preventive And Predictive Maintenance Help, Plant Basic Energy Audit, Installation & Commissioning Services, Study Of Documents Like Tray Layout, SLD, MCC Panel, Control System, Cable List & Bill Of Material, Calibration/ Testing Of Instruments Before Installation, Megarring Of Motor, Cable & MCC Panel, PLC Control System Cold Loop Checking I.E. Continuity Checking, Hot Loop Checking, I.E. With Power - Power ON Checking For MCC Panel & Instrumentation Panel, Power On Trials Of Motors No Load & On Load & Records Submission To Client, Installation Of Instruments As Per Hook-Up Drawing, Stainless Steel / Copper Tubing & Assembly Of Instruments - Extended Support To Customer For Commissioning Activities.
Search Product Alphabetically
Copyright © 2023 | Maharashtra Industries Directory. All rights reserved.