We require testing of Switchyard 220/33 KV in 160 MVA transformer along with 220 KV CT, PT, Breaker and Isolator and HT panel(15 Vertical). We also require to 33KV Cable testing.
NOTE: We want to test Tan Delta of Transformer bushing and CT Ratio before erection. and other equipment Testing Will be done after full erection of transformer.